Progress Control Engineer Jobs
By PT Surya Mas Perkasa At Pelalawan, Indonesia
Good knowledge of interpreting engineering drawing is a must.
Minimum of 2 years' work experience in progress billing for Steel Structure, Mechanical, and Piping works.
Good analytical and communication skills are a must.
Monitoring and controlling the quantity produced and progress achievement.
Calculate the progress claim and all variation orders (additional, alterations, and omission works) and prepare the backup data for the claim.
Coordination with Engineering to implement progress control and ensure progress calculations are ready for claim and billing to the Client.