Unfortunately, this job posting is expired.
Don't worry, we can still help! Below, please find related information to help you with your job search.
Some similar recruitments
Pay Per Click Specialist
Recruited by PT Paramount Enterprise International 8 months ago Address Kota Tangerang, Indonesia
Mechanical Engineering Jobs
Recruited by PT. Multi Spunindo Jaya 8 months ago Address Krian, Indonesia
Engineering Admin Jobs
Recruited by Hotel Grand Mercure Lampung 9 months ago Address Bandar Lampung, Indonesia
Landing Page Specialist Jobs
Recruited by ZaidanRahman.com 9 months ago Address Kota Tangerang, Indonesia
Comben Specialist Jobs
Recruited by MPC 9 months ago Address Kota Tangerang, Indonesia
Structural Design Specialist Jobs
Recruited by PT Alam Sutera Realty Tbk. 10 months ago Address Kota Tangerang, Indonesia
Electrical Engineering Jobs
Recruited by PT Noahtu Shipyard 11 months ago Address Bandar Lampung, Indonesia
Production Specialist Jobs
Recruited by PT. Intan Safety Glass 11 months ago Address Kota Tangerang, Indonesia
Engineering Internship Jobs
Recruited by Sheraton Lampung 11 months ago Address Bandar Lampung, Indonesia
Process Specialist Jobs
Recruited by Cargill 11 months ago Address Gresik, Indonesia
Carbon Forest Specialist Jobs
Recruited by Jejakin 1 year ago Address Kota Tangerang, Indonesia
Specialist Jobs
Recruited by UniPin 1 year ago Address Kota Tangerang, Indonesia

Engineering Specialist Jobs

Company

PT. Intan Safety Glass

Address Kota Tangerang, Indonesia
Employment type CONTRACTOR
Salary
Expires 2023-06-11
Posted at 11 months ago
Job Description

Position Summary:

Staff maintenance is responsible for ensuring that machinery is maintained and cared for in order to ensure production operates at maximum effectiveness & efficiency.


Performance Objectives:

A. Main Objective:

Ensure that preventive maintenance are conducted consistently and machinery downtime managed. Your primary objective during the first year is to revise, train & ensure visual control of preventive & cleaning maintenance - in order to facilitate the transition to Autonomous Maintenance. In achieving this, you are required to have an in-depth understanding of Total Productive Maintenance (TPM) system, understanding of maintenance business processes & have ample experience on training & development of operators.


B. Sub Objective:

  • Ensure data management of corrective, breakdown and preventive maintenance.
  • Implement proper planned maintenance with 85% spare part planning accuracy.
  • Create from scratch - machinery manual book from field observations.
  • Daily, weekly & monthly planned maintenance.
  • Ensure cost is controlled at the target maximum range set by the Finance Department.
  • Makes maintenance department rolling plan to migrate to CMMS (Computerized Maintenance Management System)
  • Introduce the calculation of Overall Equipment Effectiveness (OEE), MTBF (Mean Time Between Failure), & MTTR (Mean Time to Repair)
  • Implement a WBS (Work Breakdown Structure) on maintenance work order.


C. Management & organizational issues:

  • Outstanding Work Order at 90% every month
  • Maintain maintenance plan accuracy at 90%
  • MTTR at 4 hours
  • Overall Equipment Effectiveness at 70.


D. Changes & Improvement Needed:

  • Improve the management of consumable and spare part being used by the production department.
  • Improve the operations of planned maintenance ensuring MTTR for Overhaul & Semi-Overhaul are kept within 4 days.
  • Increase the overall standard competency of operators maintaining their own machines.
  • Implement LEAN standard Visual Management for operators & maintenance department.


E. Problems to be solved:

Machines are managed poorly in terms of the number of breakdowns, operator’s level of expertise in their own position and standardization of machinery information.


F. Technical Objectives:

Has experience kick-starting a CMMS program, understand and can create with Google Data Studio for KPI reporting, Barcode generator & Google Form Database Management, Intermediary excel formula (vlookup, xyzif function, Pivot table creation).


G. Team & People Issues:

  • Team members operate at different wavelengths - with close to 0 teamwork.
  • With production department, develop proper preventive maintenance department
  • Implement Quality Control Circle in maintenance department & the culture of continuous improvement


H. Long-range, creative, or strategic issues:

Implement Total Productive Maintenance with the help of a Computerized Maintenance Management System.


Please submit your application in linkedin and also here: https://tinyurl.com/INTANapplicationform2023